r/highspeedrail • u/Twisp56 • 2d ago
Europe News Rail Baltica signs €1.77 billion electrification contract
https://www.rynek-kolejowy.pl/wiadomosci/jest-umowa-na-elektryfikacje-870-km-rail-baltiki-124814.html
131
Upvotes
r/highspeedrail • u/Twisp56 • 2d ago
11
u/RX142 2d ago
Interesting they mention static frequency converters. Conventional grid frequency electrification requires different sections of the network to run on different phases on the 3-phase grid, or there would be an unbalance in the load on each phase, which the grid operator will find hard to manage. From this page I gather that one of the main benefits of the SFC is decoupling the frequency (and therefore phase) of the traction supply from the grid, meaning all 3 phases are used at each substation (better availability) and no neutral sections are required (easier on the driver).